Wanted Mark VIII EGR tube

XR7-4.6

Administrator
Staff member
Joined
Sep 12, 2023
Messages
5,436
Location
Roselle, IL
  • Cars in Garage
    1
  • Vehicle Details
    1994 Cougar XR7 DOHC TR3650
    Country flag
    As title says. I want it to salvage the manifold end to mate to a 99-04 Mustang 4V tube to use with my Kooks headers. Must be Mark VIII, the fitting size is different from Ford models, preferably 97-98 but I think 93-96 will work as well
     
    Last edited:
    the 97-98 egr is totally different than the mn12 ones, correct?
    There is a tube that hits both exhaust, and has connections closer to 3/8", and is stainless, correct?
    I'll look in the garage, but I have one some where. what would you trade?
     
    the 97-98 egr is totally different than the mn12 ones, correct?
    There is a tube that hits both exhaust, and has connections closer to 3/8", and is stainless, correct?
    I'll look in the garage, but I have one some where. what would you trade?

    The Mark connection is bigger than the MN12 one
     
    was the rest of the description close, stainless, manifold to manifold? iirc it was kind of a T connection. If that's accurate, I have one. I was going to use it to make HF, which is not a great idea, frankly, lol. I last saw it in 2009 or so, But I remember looking at it. Reminded me of some of the systems I worked on in the 90's
    If it looks like this, I no have :)
    https://parts.lakelandford.com/p/Li...on-EGR-Tube-Right/52715326/BC3Z9E470A.htmlThe part I'm thinking of, does not look like that.

    I'm going to get out in the garage today, I'll look thru the box o mark parts.
     
    Last edited:
    How soon are you wanting this?
    I will be pulling the engine from my 97 shortly and you can certainly have the egr tube/ other stuff. (I'm keeping the teksid block for myself)
    Hoping to do the work in 4-8 weeks.
     
    How soon are you wanting this?
    I will be pulling the engine from my 97 shortly and you can certainly have the egr tube/ other stuff. (I'm keeping the teksid block for myself)
    Hoping to do the work in 4-8 weeks.

    Not in a rush at all, so that timeframe works for me, it’ll be a spring/summer project

    Thanks!
     

    Similar threads

    Back
    Top